8 challenges (including pre-work) covering the full Azure migration lifecycle, aligned to the Cloud Adoption Framework.

gantt
  title Challenge Timeline
  dateFormat HH:mm
  axisFormat %H:%M
  section Pre-work
      Azure 101 (Pre-work)      :c0, 09:30, 30m
  section Morning
      C1 Plan                   :crit, c1, 10:30, 45m
      C2 Appliance              :active, c2, 11:15, 75m
      Lunch (Discovery runs)    :lunch, 12:30, 45m
  section Afternoon
      C3 Assessment             :active, c3, 13:15, 45m
      C4 Execute                :crit, c4, 14:00, 30m
      C5 Curveball              :c5, 14:45, 30m
      C6 Optimise               :c6, 15:15, 45m
      C7 Presentation           :done, c7, 16:00, 45m
#ChallengeDurationTypePointsCAF Phase
0Azure 101 (Pre-work)30 minSelf-paced
1Plan45 minWDS25Plan
2Deploy Appliance75 minHands-on25Prepare
3Assessment45 minHands-on20Execute
4Execute30 minWDS15Execute
5Curveball30 minWDS10Execute
6Optimise45 minWDSOptimise
7Presentation45 minPresent5All
CategoryPointsChallenges
CAF Plan25Challenge 1
CAF Prepare25Challenge 2
CAF Execute45Challenges 3, 4, 5
Presentation5Challenge 7
Total100
Bonus+15Arc, Cost, Security
TypeDescription
Pre-workSelf-paced preparation before the workshop day
Hands-on LabStep-by-step technical exercises using Azure Migrate and Azure portal
WDSWhiteboard Design Sessions — collaborative design using flip charts
CurveballA surprise requirement forcing teams to adapt
PresentationFinal team presentations in chalk-talk format
  1. Read the entire challenge before starting
  2. Divide and conquer — use your team of 4 effectively
  3. Document as you go — you’ll need it for the presentation
  4. Ask for hints — check Hints and Tips
  5. Time-box — don’t get stuck, move forward