The Execution

The roadmap is approved. The workloads are assigned to modernization paths. Now we execute — methodically, with guardrails, and with continuous validation at every step.

MCEM Stage 3 — Empower and Achieve

This is MCEM Stage 3: Empower and Achieve. The customer team is enabled to deliver the migration with Microsoft support, tooling, and best practices. The goal is not just to move workloads — it is to build the customer’s capability to operate and evolve their Azure environment independently.

Execution by Modernization Path

%%{init: {'theme':'neutral'}}%%
gantt
  title Migration Execution Timeline
  dateFormat YYYY-MM
  axisFormat %b %Y
   section Stabilize
    VM assessment & planning     :h1a, 2026-01, 1M
    VM migration waves           :h1b, after h1a, 2M
    SQL MI migration & validation:h1c, after h1a, 2M
    Fabric mirroring setup       :h1d, after h1c, 1M
   section Transform
    .NET upgrade & containerization :h2a, 2026-03, 3M
    Azure SQL DB migration          :h2b, after h2a, 1M
    CI/CD pipeline setup            :h2c, 2026-03, 2M
    Fabric mirroring setup          :h2d, after h2b, 1M

Stabilize — Execution Steps

  1. Prepare landing zone (CAF Ready phase) — Azure Virtual Network, NSGs, Azure Backup vaults, monitoring baselines
  2. Group dependencies into waves — Keep dependent systems together, start with nonproduction or lower-risk workloads, and document owners, rollback criteria, and success measures for each wave
  3. Migrate VMs in waves — Use Azure Migrate to replicate and cut over VMs in planned waves after stakeholder approval of the cutover window
  4. Migrate databases — Use the Managed Instance link where SQL MI is the target and near-real-time replication is required. Downtime is limited to the final cutover window, when applications switch to the target endpoint. Use Azure Database Migration Service (DMS) or another approved method when compatibility, version, or process constraints require it
  5. Validate and optimize — Run functional tests, validate performance, right-size VMs based on actual Azure utilization data
  6. Enable Fabric mirroring — Configure SQL MI Mirroring to OneLake for workloads where analytics is a strategic priority

Transform — Execution Steps

  1. Upgrade .NET applications — Use the .NET Upgrade Assistant or the GitHub Copilot modernization agent to migrate from .NET Framework to .NET 8+, resolve breaking changes
  2. Containerize — Create Dockerfiles, set up Azure Container Registry, configure Azure Container Apps environments
  3. Set up CI/CD — Build GitHub Actions or Azure DevOps pipelines for automated build, test, and deployment
  4. Migrate databases — Move to Azure SQL Database, adjust connection strings, validate query performance
  5. Enable Fabric mirroring — Configure Azure SQL DB mirroring to OneLake

Migration Guardrails

Every migration wave follows the same validation pattern:

%%{init: {'theme':'neutral'}}%%
graph LR
  classDef step fill:#0078d4,stroke:#005a9e,color:#fff
  PRE(["<b>Pre-migration</b><br/>Backup, snapshot,<br/>rollback plan"]):::step
  MIG(["<b>Migrate</b><br/>Replicate and<br/>cut over"]):::step
  VAL(["<b>Validate</b><br/>Functional tests,<br/>performance checks"]):::step
  OPT(["<b>Optimize</b><br/>Right-size,<br/>tune, monitor"]):::step
  PRE --> MIG --> VAL --> OPT

Wave Planning Discipline

CAF migration guidance and Azure Migrate wave planning both emphasize iterative execution. Each wave should have:

  • Dependency grouping validated by application owners and Azure Migrate data
  • A nonproduction rehearsal or lower-risk production candidate before critical production workloads
  • Migration method selection tied to workload requirements, not preference
  • Planned cutover windows, rollback criteria, and stakeholder approval
  • Post-cutover validation for functionality, performance, security, backup, monitoring, and business acceptance

Lessons from each wave should update later waves. This keeps the roadmap evidence-based as new dependencies, constraints, and operating practices emerge. Use CAF migration planning, CAF wave planning, and MI Link migration guidance as the official execution references.

Building Customer Capability

Execution is also a learning opportunity. Throughout the migration, the customer team builds skills in:

  • Azure networking and security fundamentals
  • Infrastructure-as-code (Bicep or Terraform)
  • Container operations and CI/CD pipelines
  • Fabric administration and analytics development
  • Cost management and optimization practices

By the time the migration is complete, the customer does not just have workloads in Azure — they have a team that knows how to operate them.

← Back to Modernization Paths · Continue to Outcomes →